- Other Body Parts[4]
- Plastic Sheets[3]
- Pool & Accessories[2]
- Other Fabric[1]
- 100% Polyester Fabric[1]
- Plastic Flooring[10]
- Advertising Boards[1]
- Poster Materials[10]
- Billboards[1]
- Stickers[5]
- Plastic Film[4]
- Projection Screens[10]
- Outdoor Advertising[1]
- Textile & Fabric Crafts[2]
- Flags[10]
- Contact Person : Mr. Chan Leon
- Company Name : Hangzhou Nuclear Coating Fabric Co., Ltd.
- Tel : 86-571-86578291-8018
- Fax : 86-571-86578293
- Address : Zhejiang,Hangzhou,No.207 Xintang Rd.,Jianggan District, Hangzhou . China
- Country/Region : China
- Zip : 310020
floor tiles pvc
Our floor tile is a durable,high performing flexible homogeneous multipuepose flooring especially recommedned for hospitals,schools,offices,supermarkets and intitutional building.
Following is the date sheet of our tile floor,
Steps For Installing Slate Tile Flooring
Installation Method:
1. The floor tiles should not be installed before the completion of upholstery (including paint), unless there is proper covering protection to prevent the tiles from being polluted or damaged.
2. The tiles can not be drenched or shined directly; it should be placed flatly with the room temperature over 20.
3. Installation must be after the floor or new-installed cement is completely dry which usually needs over 30 days. 3 weeks is necessary even in good draught condition. The cement floor needs to be decorated with correct proportion 1:3 and it is allowed to be touched 3 days later.
4. Special Notice: Inspect the ground before installation, the installation is feasible with the moisture under 40%; it is special ground with the moisture 40%-60% so you should install a little to confirm before mass-installation; and it is unsuitable to install with the moisture over 60%. A way to test the moisture is to flatly place a couple of tiles on the ground and see if there is vapor on the back 6-12 hours later.
5. Before installation, thoroughly clean the floor. If uneven, it should firstly be rubbed out or made even. If there is much gravel, it should be stuccoed again.
6. Make the referential ink line according to the building in order to get the center, then measure 90°with set square to get the vertical equal line, and finally, flip the datum line with ink.
7. Regard the datum line center as the starting point and then daub the floor glue with steel knife towards one of the lines; after 20 or 30 minutes, you can start the installation. It is better to daub the relevant place within 60 minutes. Equality is very important in daubing, and the floor glue is semi-touchable, so it is ok just to press the tiles.
8. After daubing and the glue is becoming a little dry (about 20 minutes), when it is not sticky in touching, install the tiles along the datum line. The tiles should be put in order and placed from top to bottom, then press around each tile to make it well agglutinated.
9. If the glue overflows from the joint, wipe immediately with wet cloth, or it will be troublesome. Please take care. (If allowed by the environment, gasoline or diluent can also be ok.)
10. When winding up, it needs to put one tile to the last floor tile that installed to make two inosculate well. Then get another as practice and make one side cling to the wall and cut the other side along the edge with art knife, and finally break along the cutting line.
11. When the edge installation is finished, it needs to clean up the fragments; and press with roller to make the tiles inosculate flatly. Then wipe with wet cloth. If there is still something dirty, please clear with a little rosin water carefully and then with clean water.
12. After installation, first clean up all the dirtiness, and then maintain the surface with acryl colophony to keep the tiles bright.
13. In daily cleanness, clean water is ok. Waxing periodically to keep the floor tiles bright. Twice or three times each month in acryl colophony is very useful.
floor tiles pvc